CONCRETE TILT UP AND PRECAST CONSTRUCTION PHOTOS
In this photo the slab has been poured and the column reinforcement starter bars are in place ready for the steel formwork to be erected. Trenches have been dug out for plumbing allowances and strip footing has been laid for more construction.
Tilt-up panels are erected and are held up by props until the roof is constructed.
The roof is constructed along with its rafters, purlins and roof material. Safety hand railing is used around the perimeter of the roof for health and safety procedures.