Tuesday, June 3, 2008























































































research into the Norman Foster's Sainsbury Building for the Major project
concrete being poured into upper level storeys
rafter connection to reinforced concrete walls
formwork for concrete stairs


steel props hold temporarily hold up tilt up panels.
concrete is being poured, reinforcement is laid and formwork is in the correct position
concrete has been poured and is in a wet state



temporary props to support the pouring of the suspended slab



Tuesday, April 29, 2008

Monday, April 21, 2008

CONCRETE TILT UP AND PRECAST CONSTRUCTION PHOTOS




In this photo the slab has been poured and the column reinforcement starter bars are in place ready for the steel formwork to be erected. Trenches have been dug out for plumbing allowances and strip footing has been laid for more construction.





Tilt-up panels are erected and are held up by props until the roof is constructed.


The roof is constructed along with its rafters, purlins and roof material. Safety hand railing is used around the perimeter of the roof for health and safety procedures.